Selby New Swing Bridge |
The cable-stayed
swing bridge will carry the new A63 bypass across the River Ouse and
features a main 95m span that rotates on a central pivot, to allow the
passage of rivertraffic.The bridge is
part of the much needed Selby bypass which will reduce trafficcongestionin
the town centre by 40 per cent, as well as preventing as many as 250
accidents over the next 30 years. |
Structure
type: |
Cable stayed swing bridge |
| Project Title: | Selby New Swing Bridge |
| Steel Fabricator/erector: | Cleveland Bridge |
| Client: | Highways Association |
| Main Contractor: | Skanska |
| Tonnage: | 1250 |
| Town: | Selby/North Yorks |
| Country: | UK |
Click on a thumbnail to enlarge |
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|